Our Case Studies

Find out more about our work

The Client:

Wirral Council

View Case Study View More

Location:

Wirral, Merseyside

Time Frame:

April 2023

Arrowe Park Rd/Borough Rd/Singleton Avenue – Traffic Signal Upgrades

The Job:

Traffic signal updates including traffic signal ducting installations, kerbing, paving, gully installations, installation of guardrail, carriageway surfacing and associated lining works.

View Case Study

The Client:

Wirral Council

View Case Study View More

Location:

Bromborough

Time Frame:

March 2023

Beechwood Rd, Bromborough

The Job:

Installation of dropped crossing points for pedestrians. Excavation of crossing areas, installation of dropped kerbs, tactiles, and edging kerbs. Reinstatement with asphalt.

View Case Study

The Client:

Wirral Council

View Case Study View More

Location:

Wirral, Merseyside

Time Frame:

March 2023

Windsor Close, New Ferry

The Job:

Concrete carriageway repairs. Excavation of existing damaged or cracked concrete carriageway and reinstatement with type 1 MOT and reinforced C40 concrete.

View Case Study

The Client:

Wirral Council

View Case Study View More

Location:

Wirral

Time Frame:

March 2021

Lyndale Avenue Car Park

The Job:

Installation of new Grasscrete car park areas and traffic calming measures on Lyndale Avenue, Eastham. Grasscrete offers significant structural advantages over traditional concrete and plastic methods of construction. For example, it’s lightweigh…

View Case Study

The Client:

Wirral Council

View Case Study View More

Location:

Wirral

Time Frame:

August 2021

River Birket Trail

The Job:

Installation of a new 2km shared footpath and cyclepath (River Birket Trial) The construction of a shared bituminous footpath and cycleway adjacent to the Birket between Reeds Lane and Oxley Avenue and a shared gritstone footpath and cycleway be…

View Case Study

The Client:

Wirral Council

View Case Study View More

Location:

Wirral, Merseyside

Time Frame:

June 2020

Market Street, Birkenhead

The Job:

PPC flagged footpath with the inclusion of new tree pit areas The footpath at Market Street, Birkenhead was significantly damaged due to large tree root growth. This had lifted the existing PCC flags and bitmac and created a hazard in the public …

View Case Study

The Client:

Wirral Waters

View Case Study View More

Location:

Wirral

Time Frame:

31 Weeks Completion Time – June 2020

Wirral Waters

The Job:

Tower road has been transformed providing a high quality, safe and attractive streetscape. It is the first project for Wirral Borough Council that incorporates Deeproot’s Silva Cells as part of the SUDS design to support the growth of the new trees …

View Case Study

The Client:

Wirral Council

View Case Study View More

Location:

Wirral, Merseyside

Time Frame:

July 2021

Kings Road, Bebington

The Job:

Lift and relay / provide and lay PCC flags in the footpath of Kings Road. Installation of new concrete driveways. This project involved the lifting and relaying of a PCC footpath and the construction of new concrete driveways (100mm Type 1 MOT a…

View Case Study